TRYFECTA · CONFIDENTIAL · DEMO ENVIRONMENT · ILLUSTRATIVE DATA NOT FOR EXTERNAL DISTRIBUTION

The Dome — Sovereign Site Uplink

Industry 6.0 · Phase 4 · Self-Healing Autonomy

12,847
Decisions / hr
11.4ms
P99 Edge Latency
99.97%
UNS Uptime · 30d
SOVEREIGN STATUS
Sovereign · Phase 4 (1)
Cognitive · Phase 3 (4)
Predictive · Phase 2 (2)
Operations
Baby Dome · Phase 1
Infrastructure Stack
Process Twin
Energy
Reports
DOME OPERATING MODE
Sovereign · Self-Healing · Cosmos World-Model Active
Tracking 14 autonomous trucks, 3 drill rigs, 5 humanoid scouts, 1.2M IoNT sensors. Backhaul bonded across Starlink PNI + 6G site mesh.
EDGE COMPUTE LOAD
42%
GB300 NVL72 · 72 Blackwell · single coherent domain
DECISIONS · LAST HR
3,184
P99 latency 11.4 ms · Cosmos sims 2,406
DEMO MODE:
PAM · ON · SOVEREIGN Toggle to see what the site looks like without PAM (legacy SCADA-only)

SOP & Compliance Layer · Live

Local law · Site policies · Environment · Safety · Control system · Inventory

AI Camera Network · Holoscan Sensor Bridge

Security · Inventory · Process · Asset Mgmt · Geotech

PAM Reasoning Stream · Physics-Grounded

Live agent thought trace

UNS Namespace · Site Slice

1.2M tags

Physics Primitives · Live

PAM grounding signals · 50 Hz
The Unified Namespace is the secondary control layer the Dome injects on top of legacy SCADA / DCS / PLC systems. Every sensor, actuator, and decision lives at one canonical path. PAM consumes the namespace; humans browse it. The UNS is the bridge that lets the Dome control without ripping out the existing control system — exactly the Industry 6.0 prompt-to-field requirement.

Pit · Mining UNS Slice

enterprise/copper-one/pit-1

Processing · Refinery UNS Slice

enterprise/copper-one/processing

Energy · Microgrid UNS Slice

enterprise/copper-one/energy

Compliance & Safety UNS Slice

enterprise/copper-one/compliance
The Dome's SOP Layer is the antifragile policy spine: every PAM decision is checked against local law, site policies, environmental permits, safety envelopes, control-system health, and inventory state — before hitting the actuator. Rejections are logged with full reasoning trace. Auditors see one paper trail. This is what makes Phase 4 sovereignty operationally accountable.
01
Instrumented Remote Ops
Standalone systems connected to a central hub. Operators control equipment from safe, remote locations. Level 1 autonomy.
COMPLETE
02
Predictive Orchestration
Real-time forecasting. Predictive maintenance reduces unplanned downtime by 30–40%. Visibility-driven dispatch.
COMPLETE
03
Cognitive Integration
LLM + agent layer governs heterogeneous swarms of robots. Intent translates from natural language directly into field execution.
COMPLETE
04
Sovereign Self-Healing Autonomy
Antifragile ecosystem. Self-configures, self-heals, performs dynamic energy arbitration without human-in-the-loop for micro decisions.
ACTIVE · COPPER ONE

NVIDIA Sovereign Stack

The reference architecture the Dome implements at every site.

  • GB300 NVL72Site brain · 72 Blackwell GPUs · single coherent domain
  • Vera Rubin Superchip3.6 EFLOPS inference · long-context reasoning · roadmap
  • Jetson AGX ThorOn-equipment edge module · multimodal AI · ms-class fault detection
  • Holoscan SDKHigh-bandwidth sensor bridge (LiDAR · thermal · vibration)
  • Cosmos World ModelsImagine-then-act · zero-defect navigation · physical reasoning
  • Omniverse DSX + Isaac Lab-ArenaHigh-fidelity twin · 40× faster sim than sequential

Connectivity & Energy Sovereignty

The bubble that keeps a remote site sovereign even if the rest of the world disconnects.

  • Starlink Performance Kit>400 Mbps down · <20 ms · –40 °C → +60 °C ruggedised
  • Starlink PNI GatewayDedicated path · bypasses public internet · sovereign data
  • Peplink SDX SpeedFusionBonded multi-Starlink + 5G/6G · 99.9% uptime
  • 6G Site MeshSub-ms peer-to-peer between drills, haulers, humanoids
  • ComAp InteliNeo 6000Solar + battery + geothermal · black-start capable
  • Internet of Nano-Things (IoNT)Molecular-scale sensors in the ore body

Antifragility

The site doesn't merely resist shocks — every disruption improves its internal logic. Sandstorms, equipment failures, comms outages all become training signal.

Prompt-to-Field

High-level objectives — "increase copper recovery 2 points without exceeding water permit" — translate into physical action via the cognitive infrastructure.

Audit Gap

The real 2026 challenge is independent validation of autonomous facilities. The Dome's SOP layer logs every decision against law, policy, environment, safety, and control health — auditor-ready by design.

Moonshot.   A staircase you can climb in weeks.

Copper One — what you're seeing across the rest of this dashboard — is the Phase 4 Sovereign Dome. It's the destination. But customers don't have to buy the destination to get value. The Baby Dome is the on-ramp: a bolt-on safety, weather, people-on-site and environmental layer we deploy in 6 weeks without touching a single PLC. Phase 2 (~+12 weeks) adds a read-only bridge into the existing SCADA / DCS / PLC. Phases 3 and 4 are the same hardware maturing into the cognitive co-pilot and then the Sovereign Dome you see live at Copper One. One install, four phases, zero rip-and-replace.

01
Baby Dome
Bolt-on safety, weather, people, environmental, incidents, permits, camera AI. Zero control-system risk.
DEPLOY · 6 WEEKS
02
Control System Bridge
Read-only UNS bridge into SCADA / DCS / PLC. Predictive maintenance, OEE, alarm rationalisation, energy/ton.
+ 12 WEEKS
03
Cognitive Co-Pilot
Agentic decisions in suggestion mode. Cosmos pre-flight sims. Operator approves write-back.
MONTHS 6–9
04
Sovereign Dome
Self-healing autonomy. Live today at Copper One — proof the staircase has a top.
LIVE · COPPER ONE

Phase 1 · Baby Dome — what's in the box

12 capabilities · ships in 2 flight cases · powers off any 240V outlet
🌦️WK 2
Weather & Lightning
5-day high-res forecast · live strike radar · auto work-stop at 8/5/3 km bands.
⚠️WK 1
Incident Management
Hazards · near-miss · injuries · environmental. Mobile capture · ICAM workflow · ISO 45001 audit-ready.
👷WK 3
Humans on Site (POB)
Live count, zone occupancy, lone-worker timer, mustering and emergency roll-call in seconds.
🚗WK 2
Visitor & Contractor
QR sign-in · NDA / induction acceptance · ANPR · expired credentials blocked at the gate.
📋WK 3
Permit-to-Work
Hot work · confined space · heights · isolation. Live expiry timers · supervisor sign-off.
🌫️WK 4
Air, Dust, Noise
PM2.5 / PM10 / TSP · boundary noise · vibration. Auto-dispatch water trucks at threshold.
📷WK 4
Camera AI · Safety
PPE detection · perimeter intrusion · slip / fall · stationary-vehicle. Edge inference.
🔥WK 5
Heat Stress · WBGT
Wet-bulb globe temperature drives mandatory rest / water schedules · fatigue-cap monitor.
🔔WK 4
Lone Worker Check-In
Periodic "I'm OK" pings · auto-escalation if missed · geo-fenced quiet zones.
🛠️WK 5
Asset & Inspection
QR-tagged extinguishers, harnesses, scaffolds. Last-inspected · next-due · traffic-light expiry.
🎓WK 3
Inductions & Certs
Site induction · first-aid · HRWL · forklift · heights. Auto-block at gate when expired.
WK 5
Energy & Water (R/O)
Modbus / pulse meters read-only into UNS. ESG-grade chart per site. Phase 2 turns it into optimisation.

Six-week deploy · contract → live dashboard

Same edge box ships pre-imaged · Phase 2 cutover starts week 7
WEEK 0
Kick-off
Site survey · data agreement
WEEK 1
Cloud live
Incident app rolled out
WEEK 2
Edge install
Met mast · gate kiosk
WEEK 3
Wire-up
Camera AI · POB · PTW
WEEK 4
Sensors
Air · noise · lightning
WEEK 5
Integrate
Assets · inductions · meters
WEEK 6
LIVE
GM dashboard signed off
+ WEEK 12 · PHASE 2
Read-only UNS bridge into customer SCADA / DCS / PLC
90-day historian backfill · predictive maintenance · OEE · alarm rationalisation · energy-per-ton — all on the same Baby Dome the customer is already logged in to.
Investor takeaway: Phase 1 sells on safety and visibility — buyers we already know how to convert (HSE managers, site GMs, COOs). It bills as SaaS, not capex. By Phase 2, the customer isn't evaluating us — they're expanding us. Same rack, same UNS, deeper wallet share, and 100% of Phase 1 hardware carries forward into Phase 4. The Sovereign Dome isn't where we start; it's where the staircase ends.
~6 wks
From PO to first live dashboard. No PLC integration in the critical path.
$0 capex
Hardware leased into the SaaS subscription. Customer signs an opex line, not a capital request.
3–4×
Phase 2 expansion ARR over Phase 1 once control-system tags light up on the same dashboard.
100%
of Phase 1 hardware carries forward into Phase 4. We never come back to rip and replace.